Mapped (unverified)colocation
UltraEdge Montpellier
Montpellier, Occitanie, France
Source: Primary source
UltraEdge Montpellier is a mapped data center in Occitanie, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Occitanie
Overview
source: linkUltraEdge — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Chaleur, eau, électricité : et si les déchets des data centers devenaient des ressources (ou vice versa) ?The Conversation· Aug 10, 2026
- APL Data Center ouvre de nouveaux bureaux à MarseilleLa Provence· Jun 15, 2026
- France Travail : L’IA censée faciliter le retour à l’emploi et dégager du temps avec les conseillersdis-leur.fr· Jun 13, 2026
- "Montrer que Fumel est une ville du XXIe siècle" : un data center géant pourrait voir le jour sur une friche industrielle de 4 hectaresPetitBleu.fr· Jun 3, 2026
- ETIX frappe fort : le géant français des data centers rachète 4 sites en Occitanie pour s’imposer face aux mastodontes du numériqueladepeche.fr· Jun 2, 2026
- Green4Cloud va créer une constellation de micro-datacentersLe Journal des Entreprises· Apr 21, 2026
See something wrong or missing on this page? Suggest a correction.