Mapped (unverified)colocation
UltraEdge Lyon-Venissieux
Vénissieux, Auvergne-Rhône-Alpes, France
Source: Primary source
UltraEdge Lyon-Venissieux is a mapped data center in Auvergne-Rhône-Alpes, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkUltraEdge — colocation facility (82 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Economie. Ils sont indispensables à l'IA : y a-t-il un data center près de chez vous?Le Progrès· Jun 11, 2026
- Vénissieux. Après de nouvelles fusillades, La Poste suspend la distribution du courrier dans le quartier Joliot-CurieTribune de Lyon· Apr 16, 2026
- UltraEdge investit 15 millions d'euros dans son data center de VénissieuxBref Eco· Mar 26, 2026
- LFI s’empare de Vénissieux de justesse après 90 ans de communismeTribune de Lyon· Mar 23, 2026
- Vénissieux : UltraEdge mise sur Lyon pour son réseau de data centersmesinfos· Mar 19, 2026
- UltraEdge injecte 15 millions d’euros pour moderniser et agrandir son data center de VénissieuxTribune de Lyon· Mar 17, 2026