Mapped (unverified)colocation
Axione ADTIM
Alixan, Auvergne-Rhône-Alpes, France
Source: Primary source
Axione ADTIM is a mapped data center in Auvergne-Rhône-Alpes, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Overview
source: linkAxione Adtim — colocation facility (5 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Un projet de data center à 1,5 milliard d’euros suspendu par la justiceReporterre, le média de l'écologie· Jul 24, 2026
- « IA pas moyen » : à Crest aussi, on s’oppose au data center de RovaltainLe Dauphiné Libéré· Jul 17, 2026
- La justice bloque le projet de data center d’IA de Sesterce à RovaltainDCmag· Jul 15, 2026
- Drôme. Projet de data center à Alixan : Marine Tondelier veut « tout arrêter » et ouvrir un débat nationalLe Dauphiné Libéré· Jul 13, 2026
- Data center : suspension du permis de construire du méga-projet de Sesterce à ValenceLa Tribune· Jul 13, 2026
- Drôme : le supercalculateur géant de Sesterce suspenduLyon Capitale· Jul 13, 2026
See something wrong or missing on this page? Suggest a correction.