Mapped (unverified)colocation
UltraEdge Grenoble
Grenoble, Auvergne-Rhône-Alpes, France
Source: Primary source
UltraEdge Grenoble is a mapped data center in Auvergne-Rhône-Alpes, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkUltraEdge — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Alpilink construit un data center proche de GrenobleDCmag· Jun 15, 2026
- Référé suspension contre le Data Center à Rovaltain – Communiqué de presseLes Amis de la Terre France· Jun 12, 2026
- Villefontaine et Eybens. Usine à IA DataOne : le PDG organise une réunion publique début juinLe Dauphiné Libéré· May 13, 2026
- Isère. Supercalculateur IA à Villefontaine : les associations réclament un débat publicLe Dauphiné Libéré· Apr 26, 2026
- Isère. Data Center à Villefontaine : une réunion publique le 25 avrilLe Dauphiné Libéré· Apr 20, 2026
- Réunion du collectif Stop DataOne (contre le SuperCalculateur d'Eybens)Ici-Grenoble.org· Feb 23, 2026
See something wrong or missing on this page? Suggest a correction.