Mapped (unverified)colocation
Telxius Derio DC
Derio, Euskadi, Spain
Source: Primary source
Telxius Derio DC is a mapped data center in Euskadi, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Euskadi
Overview
source: linkTelxius Cable — colocation facility (7 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Sarenet inaugura en el parque tecnológico de Derio su mayor centro de datosExpansión· Jun 19, 2026
- Sarenet inaugura su centro de datos de 20 millones en DerioEl Correo· Jun 19, 2026
- Sarenet planta cara a los gigantes hiperescalares con un centro de datos de proximidad de 20 millones en Derio (Bizkaia)El Economista· Jun 19, 2026
- Alberto Iglesias Fraga: Sarenet inaugura centro de datos en Derio con 3 MW operativos y apuesta por grandes integradoresTraders Union· Jun 19, 2026
- Sarenet inaugura su primer centro de datos en Derio con 3 MW de potencia instaladaZonamovilidad.es· Jun 19, 2026
- El centro de datos de Sarenet en Derio abre sus puertas con 3 MW operativos y la vista puesta en los grandes integradoresEl Español· Jun 19, 2026
See something wrong or missing on this page? Suggest a correction.