Ibercom San Sebastian is a mapped data center in Euskadi, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Euskadi
Overview
source: linkIbercom — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Microsoft avanza en su gran campus de centros de datos en Alcalá de Henares: dónde estará y qué falta para que salga adelanteMadridinforma· Apr 30, 2026
- IBM inaugura el ordenador que sitúa a España en la carrera de la utilidad cuánticaEL PAÍS· Oct 14, 2025
- Los centros de datos, fuente de empleo: dan trabajo a 6.000 personas y los nuevos espacios prometen 13.000 puestos másEl Español· Apr 21, 2025
- Los nuevos centros de datos de Microsoft en España no consumirán agua para su refrigeraciónMicrosoft Source· Mar 19, 2025
- IBM despliega en San Sebastián su ordenador cuántico operativo más avanzado y único en EuropaEL PAÍS· Mar 13, 2025
- Radiografía de los centros de datos: España se vuelca en una nueva industria intensiva en energía y aguaEL PAÍS· Oct 19, 2024
See something wrong or missing on this page? Suggest a correction.