Mapped (unverified)
TelemaxX IPC2
Karlsruhe, Baden-Württemberg, Germany
Source: OpenStreetMap
TelemaxX IPC2 is a mapped data center in Baden-Württemberg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkRechenzentrum IPC2 der TelemaxX Telekommunikation GmbH
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Weg frei für Rechenzentrum: Stadtrat kippt Stufenplan nach 14 JahrenMerkur· May 23, 2026
- Bietigheim verschickt Grundsteuerbescheide über Cent-BeträgeBadische Neueste Nachrichten· Nov 6, 2025
- Unterschleißheim: Neues Rechenzentrum steht in den StartlöchernMerkur· Sep 1, 2025
- Leitwerk und E-Werk Mittelbaden bauen größtes Rechenzentrum zwischen Karlsruhe und BaselDataCenter-Insider· Aug 28, 2025
- Rolls-Royce und Ineratec arbeiten für Datacenter-Notstrom zusammenDataCenter-Insider· Aug 14, 2025
- In Lahr: Größtes Rechenzentrum zwischen Karlsruhe und Basel entstehtStadtanzeiger Ortenau· Aug 5, 2025