Mapped (unverified)colocation
Datacenter Stadtwerk Konstanz
Konstanz, Baden-Württemberg, Germany
Source: Primary source
Datacenter Stadtwerk Konstanz is a mapped data center in Baden-Württemberg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Overview
source: linkStadtwerke Konstanz GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Alexander Windbichler: So kam ein HTL-Schüler zu 100 RechenzentrenKleine Zeitung· Jun 4, 2026
- 30 Millionen Euro für Wärmenetzestadt+werk· Apr 27, 2026
- Gründung von Wärmeverbundstadt+werk· Nov 27, 2025
- Digital - Internetglasfaserkabel. Überall. Sogar im Bodensee.SRF· Jun 27, 2016
- New German operator Data Center Capital launchesData Center Dynamics· Aug 27, 2026
- Magnetic Phenomena Discovery Paves Way to Faster and More Efficient Data StorageSciTechDaily· Sep 4, 2021
See something wrong or missing on this page? Suggest a correction.