TelemaxX IPC1 is an operating data center in Baden-Württemberg, Germany. DataCentersExposed has documented a 6,856 sq ft footprint at this site. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Footprint
6,856 sq ft
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Overview
source: linkRechenzentrum IPC1 der TelemaxX Telekommunikation GmbH
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Telemaxx in Karlsruhe: Wie der Cloud-Anbieter in die Krise gerietBadische Neueste Nachrichten· Jul 11, 2026
- IONOS SE: Wenn das Büro zur Sauna wird: Kühl-Tipps aus dem RechenzentrumSaarbrücker Zeitung· Jun 25, 2026
- Hitze im Büro: Mit diesen Kühl-Tricks bleibt Arbeiten erträglichWochenblatt Reporter· Jun 25, 2026
- Großes Rechenzentrum: "Wir können uns nicht von Trump den Stecker ziehen lassen"SWR· Jun 18, 2026
- Neues Milliardenprojekt soll entstehen - PhilippsburgDie Rheinpfalz· Jun 18, 2026
- "Das könnte größer werden als Stuttgart 21": Stadt arbeitet an 380-Kilovolt-NetzanschlussSWR· Jun 16, 2026
See something wrong or missing on this page? Suggest a correction.