Telehouse Teleport
7 Teleport Drive · New York City, Richmond County, NY
Source: OpenStreetMap
Telehouse Teleport is an operating data center in Richmond County, NY, operated by Telehouse. DataCentersExposed has documented 10 MW of reported power capacity and a 69,999 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkTelehouse Teleport is an operating data center in New York City's Richmond County, New York, run under the Telehouse name. Its reported footprint is 69,999 square feet. The site draws power from Consolidated Edison Co-Ny Inc within the NYIS balancing authority. Ownership above the Telehouse operation is not detailed in available records.
Operator chain
The grid behind this site, right now
source: NYISO · gridstatus- Natural Gas68.4%
- Nuclear13.9%
- Hydro8.5%
- Other6.4%
- Wind2.8%
Real-time generation mix for the NYISO grid this site draws from, as of Jul 15, 2026, 10:10 PM. ISO-wide, not this facility's own metering. Source: gridstatus.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- AI Data Center Freeze Could Halt NYC ExpansionPatch· Jun 4, 2026
- From Outage to Action: A Guide to Cloud Region MigrationData Center Knowledge· May 12, 2026
- Google-Anthropic Deal: AI Capacity Now Pre-Sold at Gigawatt ScaleData Center Knowledge· May 1, 2026
- Speed to Power: How Developers Are Restructuring for AI DemandData Center Knowledge· Apr 30, 2026
- Microsoft AI Surge Exposes Data Center Capacity GapData Center Knowledge· Apr 30, 2026
- Oracle’s Project Jupiter Ditches Gas Turbines for Bloom Fuel CellsData Center Knowledge· Apr 29, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 5 MW (interconnection capacity): 1.2 L/kWh cooling (cool climate) + 0.45 gal/kWh embedded in US grid average. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Northeast Urban), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, New Ventures Charter School in Staten Island, is 0.3 mi from this site (155 students). 4 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.