Mapped (unverified)colocation
Techno-Z
Salzburg, Salzburg, Austria
Source: Primary source
Techno-Z is a mapped data center in Salzburg, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Salzburg
Overview
source: linkTechno-Z Verbund GmbH — colocation facility (18 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Deutsche Firma investiert in Grazer RechenzentrumORF ON· Aug 26, 2026
- Nickelsdorf diskutiert Rechenzentrum-VorgabenORF ON· Aug 21, 2026
- Signation | ThemenORF ON· Aug 21, 2026
- Burgenland heute vom 21.08.2026ORF ON· Aug 21, 2026
- KI-Rechenzentren könnten viel umweltfreundlicher sein – warum sie es bisher noch nicht sindSalzburger Nachrichten· Aug 14, 2026
- Politische Debatte über mögliches Rechenzentrum startetORF ON· Aug 7, 2026
See something wrong or missing on this page? Suggest a correction.