conova - Datacenter 4/5 is a mapped data center in Salzburg, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Salzburg
Overview
source: linkconova communications GmbH — colocation facility (6 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Finanzpolizei: Übertretungen bei Google-Rechenzentrum-GroßprojektDer Standard· Mar 3, 2026
- Austrian Data Center Association startet Initiative - Österreich öffnet erstmals die Türen zu seinen RechenzentrenLeadersnet· Oct 29, 2025
- Österreichs neues Data Center läuft mit Wasserkraft | Fragmentix KI Rechenzentrumwirtschafts-nachrichten.at· Sep 27, 2025
- Hochsicherheits-Rechenzentrum für KI in Lendsalzburg.ORF.at· Sep 23, 2025
- "Vollständig unabhängiges" Hochsicherheits-Rechenzentrum für KI-Anwendungen entsteht in Lendsalzburg24· Sep 22, 2025
- Unscheinbar, aber unverzichtbar: Die stille Macht der RechenzentrenOberösterreichische Nachrichten· Aug 5, 2025
See something wrong or missing on this page? Suggest a correction.