Sieć Szerokopasmowa Polski Wschodniej is a mapped data center in województwo lubelskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo lubelskie
Overview
source: linkWojewództwo Lubelskie — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Piaseczno. Trzy centra danych w jednej gminie? Ekspert: mogą konkurować o wodę i energię | TVN WarszawaTVN24· Sep 26, 2026
- Spółka chciała odroczyć płatności przez "siłę wyższą". Akcje poszły w dółTVN24· Sep 24, 2026
- Jak zapewnić wysoką dostępność aplikacji biznesowych bez inwestowania we własne Data Center?Lublin112· Aug 31, 2026
- Wstają przed świtem, żeby nabrać wody. Obok powstaje centrum danychTVN24· Aug 26, 2026
- Nvidia i OpenAI szykują megaprojekt. W grze setki miliardów dolarówTVN24· Jul 27, 2026
- AI wprost pożera otoczenie. Niepokojący raportTVN24· Jun 5, 2026
See something wrong or missing on this page? Suggest a correction.