Mapped (unverified)colocation
Sieć Szerokopasmowa Polski Wschodniej
Lublin, województwo lubelskie, Poland
Source: Primary source
Sieć Szerokopasmowa Polski Wschodniej is a mapped data center in województwo lubelskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo lubelskie
Overview
source: linkWojewództwo Lubelskie — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- "Death By Banana Muffin" | The Hunting Party | NBC Data Center (g7DA3ilbJs)Fathom Journal· Jun 13, 2026
- Ukrainian Legion volunteers signed contracts with Ukraine’s army in Lublin, training to followmezha.net· Mar 20, 2026
- Russian drone incursion in Poland prompts NATO leaders to take stock of bigger threatsWSLS· Sep 11, 2025
See something wrong or missing on this page? Suggest a correction.