SFR Netcenter Bordeaux
Bordeaux, Nouvelle-Aquitaine, France
Source: OpenStreetMap
SFR Netcenter Bordeaux is an operating data center in Nouvelle-Aquitaine, France. DataCentersExposed has documented a 41,520 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Est. capacity
~5-20 MW
Footprint
41,520 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Nouvelle-Aquitaine
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Gironde : « souveraineté des données » contre « gaspillage colossal de ressources », ce projet de data center à Pessac qui illustre la tension sur les enjeux énergétiquessudouest.fr· Aug 14, 2026
- Bordeaux Métropole : un immense data center de 8 300 m² bientôt construit à Pessac ?Bouger à Bordeaux· Jul 13, 2026
- À Pessac, un data center s’apprête à sortir de terre et soulève de nombreuses questionsRue89Bordeaux· Jul 8, 2026
- Gironde : ce data center géant qui pourrait voir le jour avant le projet bordelaissudouest.fr· Jun 17, 2026
- Pas encore sorti de terre, le projet de data center géant en Gironde inquiète déjà les habitantsFrance 3 Régions· Jun 13, 2026
- Gironde : Un géant data center 4x plus puissant que le plus grand data center de France s'installe bientôt 🤯Quoi Faire à Bordeaux· Jun 10, 2026
See something wrong or missing on this page? Suggest a correction.