Axione Limousin is a mapped data center in Nouvelle-Aquitaine, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Nouvelle-Aquitaine
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkAxione Limousin — colocation facility (4 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Arquus Limoges pourrait produire un drone militaire terrestre pour RenaultLa Montagne· Apr 2, 2026
- Bordeaux accueille le premier Datapole d’UltraEdge, hébergeur majeur de données en FranceSud Ouest· Mar 9, 2026
- Très forte croissance des résultats 2025 du groupe Legrand, basé à Limoges, portés par l'activité liée aux Data centerici.fr· Feb 12, 2026
- Data center : pour plus de sécurité, cette entreprise a son idée pour stocker ses données informatiquesFrance 3 Régions· Nov 18, 2025
- IA, souveraineté, sécurité, responsabilité : la quadrature du cloudLes Echos· Nov 5, 2025
- Limoges : convoité par un groupe étranger, Legrand a dit non avec le soutien de Bercyici.fr· Oct 9, 2025
See something wrong or missing on this page? Suggest a correction.