Mapped (unverified)colocation
Sevilla Datacenter
Seville, Andalucía, Spain
Source: Primary source
Sevilla Datacenter is a mapped data center in Andalucía, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Andalucía
Overview
source: linkSevilla Datacenter — colocation facility (9 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Inversión de 4.600 millones frente a CO2 y agua, el dilema de Zamora y su centro de datosEFE Verde· Sep 28, 2026
- Ni el centro de datos de la Junta de Andalucía alcanzaría la eficiencia que exige el GobiernoEl Confidencial· Sep 13, 2026
- El nuevo CPD de la Junta en Sevilla alcanza el 33% de ejecuciónData Center Dynamics· Sep 7, 2026
- Sustitución de Balanceadores en el CPD (Centro de Procesamiento de Datos) Regional de SevillaJunta de Andalucía· Sep 2, 2026
- Andalucía cifra en 10.000 millones las inversiones amenazadas por el decreto de centros de datosEl Conciso· Sep 2, 2026
- Andalucía presentará alegaciones al plan del Gobierno que impone una criba en los centros de datosEl Periódico de la Energía· Sep 1, 2026
See something wrong or missing on this page? Suggest a correction.