Mapped (unverified)colocation
Avenida Montes Sierra 36, Sevilla
Seville, Andalucía, Spain
Source: Primary source
Avenida Montes Sierra 36, Sevilla is a mapped data center in Andalucía, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Andalucía
Overview
source: linkEspacio Rack — colocation facility (8 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- Inversión de 4.600 millones frente a CO2 y agua, el dilema de Zamora y su centro de datosEFE Verde· Sep 28, 2026
- Sustitución de Balanceadores en el CPD (Centro de Procesamiento de Datos) Regional de SevillaJunta de Andalucía· Sep 2, 2026
- Andalucía cifra en 10.000 millones las inversiones amenazadas por el decreto de centros de datosEl Conciso· Sep 2, 2026
- Andalucía presentará alegaciones al plan del Gobierno que impone una criba en los centros de datosEl Periódico de la Energía· Sep 1, 2026
- La Junta de Andalucía presentará alegaciones contra el decreto estatal de centros de datosDiario de Sevilla· Sep 1, 2026
- Pensilvania impone "límites estrictos" a los centros de datos de IA ante elevado consumo de elecricidad y aguaEFE Verde· Aug 19, 2026