Redcentric London West
Hounslow, United Kingdom
Source: OpenStreetMap
Redcentric London West is an operating data center in United Kingdom, operated by Redcentric. DataCentersExposed has documented a 114,611 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
Redcentric
Operator
Redcentric
Est. capacity
~20-50 MW
Footprint
114,611 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Overview
source: linkRedcentric London West is a mapped data center in Hounslow, United Kingdom, operated by Redcentric. Its reported footprint is 114,611 square feet. A parent company above Redcentric is not disclosed in available records.
Operator chain
- Ultimate parentRedcentric
- Files asRedcentric
- This facilityRedcentric London West
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Urban data centre operator scales to 11 sites with Redcentric dealBusiness Sale Report· May 6, 2026
- British firm Stellanor snaps up data centre amid scramble for AI capacityCity AM· Apr 8, 2026
- Stellanor acquires data center outside London from chip design firm ImaginationBeBeez International· Apr 8, 2026
- UK MSP Redcentric offloads data center business for £127mData Center Dynamics· Oct 23, 2025
- UK MSP Redcentric confirms talks to potentially sell data center businessData Center Dynamics· Aug 22, 2025
- UK MSP Redcentric swings to a loss after acquiring 4D and Sungard data centersData Center Dynamics· Aug 25, 2023
See something wrong or missing on this page? Suggest a correction.