Mapped (unverified)colocation
ABStation
Greenwich, United Kingdom
Source: Primary source
ABStation is a mapped data center in United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Overview
source: linkThames Network Limited — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Data centre proposed for Charlton industrial sitesYahoo News Canada· Aug 23, 2026
- Patrizia joint venture plans 1m sq ft Greenwich data centreGreen Street News· Aug 21, 2026
- Plans unveiled for huge data centre by the Thames in LondonAOL.ca· Aug 20, 2026
- Data centre the size of 14 football pitches could be coming to CharltonNews Shopper· Aug 20, 2026
- Knight Dragon reveal plans for future Greenwich riverside tower near o2Murky Depths· Aug 19, 2026
- Plans filed for 180MW data center development in East London, UKData Center Dynamics· Aug 19, 2026
See something wrong or missing on this page? Suggest a correction.