Rackspace Somerset NYC1
Somerset County, NJ
Source: OpenStreetMap
Rackspace Somerset NYC1 is a mapped data center in Somerset County, NJ, operated by Rackspace Technology, Inc.. DataCentersExposed has documented a 18,407 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 12, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
Operator chain
- Ultimate parentRackspace Technology, Inc.
- Files asRackspace Technology, Inc.
- This facilityRackspace Somerset NYC1
In the news
source: Google News- Apollo-Backed Rackspace Loan Jumps on AMD Data Center DealBloomberg.com· Jun 16, 2026
- Why This AI Data Center Stock Is Surging on an AMD PartnershipBarron's· Jun 16, 2026
- Rackspace shares jump 30% after securing AMD-powered AI infrastructure agreement (RXT)MSN· Jun 16, 2026
- Rackspace Technology Shares Surge After Securing AMD Compute DealHarianBasis.co· Jun 16, 2026
- SpaceX, Rackspace surge premarket; Edgewise Therapeutics, Huntsman fall By Investing.comInvesting.com Australia· Jun 16, 2026
- Why This AI Data Center Stock Is Surging 25% on an AMD PartnershipBarron's· Jun 16, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
An estimated ~5 to 10 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price. Estimated from the building footprint at 200 to 400 W/ft² (the typical range for modern data centers). A rough order-of-magnitude figure, not a metered or permitted capacity.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Nearest school
source: HIFLD / NCESThe nearest public school, Elizabeth Avenue School in Somerset, is 0.3 mi from this site (554 students). 2 public schools sit within a mile of the site.
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.