CyrusOne Somerset is an operating data center in Somerset County, NJ, operated by CyrusOne LLC. DataCentersExposed has documented 40 MW of reported power capacity and a 318,583 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkCyrusOne Somerset is an operating colocation data center in Somerset County, New Jersey, run by CyrusOne LLC. The site covers 318,583 square feet, drawing power from Public Service Elec & Gas Co within the PJM grid. Its operations sit under the broader CyrusOne data center portfolio.
Operator chain
- Ultimate parentCyrusOne LLC
- Files asCyrusOne LLC
- This facilityCyrusOne Somerset
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- ShinyHunters hackers claim to have hit data center provider used by Microsoft and MetaTechRadar· Aug 26, 2026
- Yomiuri: KEPCO, CyrusOne to Build Hyperscale Data Center in Osaka Prefecture with Completion Planned in 2029MarketWatch· Aug 26, 2026
- Data centers in danger? Attackers blackmail Cyrus, as infrastructure data may have been stolenCybernews· Aug 25, 2026
- Top 10: Data Centre Companies in the UKData Centre Magazine· Aug 19, 2026
- How One Data Center Company Plans to Earn Texans' TrustGovTech· Aug 17, 2026
- Vantage, CyrusOne, and DayOne all plan IPOs with potential record breaking valuationsData Center Dynamics· Aug 13, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Water use
No measured record exists, so this is a low-confidence model from 37 MW (interconnection capacity): 1.8 L/kWh cooling (temperate climate) + 0.5 gal/kWh embedded in PJM grid mix. How we estimate. Have a utility document? Send it and we'll replace this with the real figure.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
What this site costs the grid
source: PJM RPM auction reportsPJM's capacity auction sets a $/MW-day price that utilities pass on to every household and business in the zone. This site sits in PJM's PSEG pricing zone, where soaring data-center demand is a documented driver. See the full zone-by-zone breakdown →
40 MW of load at the zone's $333/MW-day, annualized — the capacity charge a load this size carries at the current auction price.
Separately, a typical home in this zone pays an estimated $4 to $10/mo more on the capacity portion of its bill that PJM's market monitor attributes to data-center demand. See your address's full impact →
Air quality near this site
source: AirNowAir Quality Index from the nearest AirNow reporting area (Central), as of 2026-06-10. Regional context — not this facility's own emissions.
Who lives nearby
source: Census ACS 2023Demographics of the census tract this facility sits in (American Community Survey 5-year estimates). Environmental-justice context for who bears the local impacts.
Nearest school
source: HIFLD / NCESThe nearest public school, Elizabeth Avenue School in Somerset, is 0.7 mi from this site (554 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline