Mapped (unverified)colocation
PureColo St John SJ1
Saint John, New Brunswick / Nouveau-Brunswick, Canada
Source: Primary source
PureColo St John SJ1 is a mapped data center in New Brunswick / Nouveau-Brunswick, Canada. It runs on Canada's grid, which was 23% fossil-fuelled at 191 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
191 gCO₂/kWh
Clean electricity
77%
Region
New Brunswick / Nouveau-Brunswick
Overview
source: linkPureColo Inc. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
191 gCO₂/kWh
Clean electricity
77%
Fossil electricity
23%
National grid context, not this facility's own metering. Full country picture: Canada data centers.
In the news
source: Google News (local + English)- Meta data centre could drive up Albertans’ power bills: reportCTV News· Aug 28, 2026
- Underwater AI data centre proposal concerns Peskotomuhkati leaders in Canada, U.S.CBC· Aug 26, 2026
- A data centre looming for LornevilleBroadview Magazine· Aug 19, 2026
- ‘Not acceptable’: Saint John mayor rips protest signs on uptown buildingsCTV News· Jul 21, 2026
- NB Power Concerned Over Proposed AI Data Centre Dasha Burns (wvF8tM8mOn)Mshale· Jul 19, 2026
- Cybersecurity expert questions VoltaGrid’s foreign interference claim in street festival controversyNB Media Co-op· Jul 17, 2026
See something wrong or missing on this page? Suggest a correction.