Canada · province
New Brunswick / Nouveau-Brunswick
DataCentersExposed tracks 1 AI data center in New Brunswick / Nouveau-Brunswick, Canada — 0 operating and 0 in the pipeline — drawing 0 MW of reported power demand from 0 tracked operators.
Sources: Canada, Methodology
Tracked
1
Operating
0
In pipeline
0
Reported power
0 MW
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Facilities
Tracked data centers
- Mapped (unverified)
In the local press
New Brunswick / Nouveau-Brunswick data-center coverage
- New Brunswick announces six new school projects in latest education budgetCTV News· Dec 4, 2025
- Proposed data centre would need almost half of Tantramar gas plant’s powerCBC· Nov 12, 2025
- New Brunswick expects to complete minerals strategy by 2026CTV News· Oct 28, 2025
- Eel riverHitachi Energy· Jul 3, 2025
- 2 First Nations collaborate with B.C. company on possible battery project in BelleduneCBC· Apr 20, 2025
- As snowstorm rolls over New Brunswick, road conditions worsenCBC· Feb 13, 2025
Live headlines via Google News — in English and Canada's local press.