Project Pumpkin 2A is a proposed data center in Roberts County, TX, operated by Google LLC and ultimately owned by Alphabet Inc.. DataCentersExposed has documented a 761,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAnnounced investment: $0.40. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Operator chain
- Ultimate parentAlphabet Inc.
- Files asGoogle LLC
- This facilityProject Pumpkin 2A
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: GDELT- Google, OpenAI among companies to comply with Texas AI data center rules - YahooYahoo· Aug 21, 2026
- Google, OpenAI among companies to comply with Texas AI data center rules - USA TodayUSA Today· Aug 21, 2026
- Google pledges $6 million to West Texas towns as data center is built - Abilene Reporter-NewsAbilene Reporter-News· Aug 19, 2026
- Google, Rowan And CleanSpark Commit To Texas Data Center Standards Under Gov. Abbott - Dallas ExpressDallas Express· Aug 13, 2026
- Abbott says Google, Rowan, CleanSpark will meet Texas data center rules - Bryan College Station EagleBryan College Station Eagle· Aug 13, 2026
- Google (GOOGL) Backs Anthropic Texas AI Data Center Project Worth $15 Billion - simplywall.stsimplywall.st· Aug 2, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77These tax breaks are recorded to Alphabet Inc. (the operator/parent) and may cover this or other sites — no state names the recipient at the facility level.
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2026 · term — yr · source
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Data Center ExemptionTax break$0State of Texas · granted 2025 · term — yr · source
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2025 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)Tax break$16,044,286Ellis County, TX · granted 2024 · term — yr · source
- Chapter 312 — Midlothian Technology Reinvestment Zone No. 14 (City of Midlothian data-center zone)Tax break$15,660,346Ellis County, TX · granted 2024 · term — yr · source
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2022 · term — yr · source
- Texas Qualifying Large Data Center Project ExemptionTax break$0State of Texas · granted 2018 · term — yr · source
Texas reported $16.1M in Property used in certain large data center projects; temporary exemption (Texas Tax Code § 151.3595) for FY2025 (Texas Comptroller of Public Accounts). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Miami School in Miami, is 906 ft from this site (206 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.