Mapped (unverified)colocation
Pnt Data Center
Opole, województwo opolskie, Poland
Source: Primary source
Pnt Data Center is a mapped data center in województwo opolskie, Poland. It runs on Poland's grid, which was 69% fossil-fuelled at 591 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
591 gCO₂/kWh
Clean electricity
31%
DC power price
21.48¢/kWh
Region
województwo opolskie
Overview
source: linkPark Naukowo-Technologiczny w Opolu Sp. z o.o. — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
591 gCO₂/kWh
Clean electricity
31%
Fossil electricity
69%
Data-center power price
21.48¢/kWh
A large data center in Poland pays 21.48¢/kWh for electricity — a household pays 24.77¢, 13% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Poland data centers.
In the news
source: Google News (local + English)- Fotowoltaika i magazyn energii w trybie "zero eksport" zasili centrum danych w OpoluGramwzielone.pl· Apr 16, 2026
- Park Naukowo-Technologiczny będzie miał farmę fotowoltaiczną [WIDEO]Czas na Opole· Apr 15, 2026
- Energia, która nie pójdzie w gwizdekCzas na Opole· Apr 14, 2026
- Park Naukowo-Technologiczny w Opolu buduje farmę fotowoltaiczną z magazynami energiiTVP Opole· Apr 14, 2026
- Nowa farma fotowoltaiczna w Opolu. Auta zaparkują pod panelamiOpolska360· Apr 14, 2026
- Farma fotowoltaiczna i magazyny energii powstaną w Opolu. Samochody zaparkują pod panelamiNTO· Apr 14, 2026