Skip to content
DataCentersExposed
Mapped (unverified)

Orange Lyon Lumière - Centrale

Auvergne-Rhône-Alpes, France

Source: OpenStreetMap

Orange Lyon Lumière - Centrale is a mapped data center in Auvergne-Rhône-Alpes, France. DataCentersExposed has documented a 34,398 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 14, 2026

Real parent
Operator
Est. capacity
~5-15 MW
Footprint
34,398 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Auvergne-Rhône-Alpes
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

data center

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh

A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: France data centers.

Environmental permits

source: Géorisques (ICPE)
  • ORANGE EX FRANCE TELECOM0010600573
    ICPE Enregistrement · Lyon 69003 · registered as "ORANGE EX FRANCE TELECOM" · ~63 m from the mapped location (name match)

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.