NV11–NV14 Data Center Campus
Sparks, Storey County, NV
Source: Primary source
NV11–NV14 Data Center Campus is a proposed data center in Storey County, NV. DataCentersExposed has documented 224 MW of reported power capacity and a 1,000,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: linkAnnounced investment: $3.0B. Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- Jackson moratorium on data centers sparks debate between activists and developersWAPT· Jul 15, 2026
- Ohioans sue over blocked vote on local data center dealCleveland.com· Jul 15, 2026
- Makarewa Data Centre Sparks Public MeetingWhat’s On Invers· Jul 15, 2026
- New York's AI data center pause sparks warnings US could lose ground to ChinaFox Business· Jul 15, 2026
- Cedar Rapids data center approval sparks calls for more transparency at City HallKGAN· Jul 14, 2026
- Proposed La Pine-area data center sparks backlash ahead of city council meetingCentral Oregon Daily· Jul 14, 2026
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Nevada reported $80.7M in Data center partial abatement of local sales/use tax (NRS 360.754) — all local components combined for FY2025 (State of Nevada Controller's Office). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Hillside Elementary School in Sparks, is 9.7 mi from this site (47 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.