Mapped (unverified)colocation
NTT Madrid 1 Data Center (MAD1)
Las Rozas de Madrid, Comunidad de Madrid, Spain
Source: Primary source
NTT Madrid 1 Data Center (MAD1) is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkNTT DATA's Global Data Centers division — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- T-Systems mejora la eficiencia de su centro de datos de Cerdanyola con un PUE de 1,35 en el primer semestr ...Las Rozas Hoy· Aug 24, 2026
- Regresa la Feria de Moncalvillo de San Agustín del Guadalix en septiembreEl Resurgir de Madrid· Aug 12, 2026
- "Las IA's son apocalípticas, nunca podrán integrarse"El Periódico· Aug 5, 2026
- San Agustín del Guadalix - DATA4 impulsa su expansión en España con un nuevo centro de datos en San AgustínEl Resurgir de Madrid· Jul 29, 2026
- 👧 Crear un robot o programar un pequeño centro de datos es uno de los retos a los que se han enfrentado este martes más de un centenar de alumnos de tres colegios zaragozanos. El @ita_tecnologia y Amazon han acercado la tecnología a los más pequeinstagram.com· Jun 16, 2026
- España acelera la movilidad inteligente con chips e IALa Ecuación Digital· Jun 14, 2026
See something wrong or missing on this page? Suggest a correction.