NorthC Rotterdam Zestienhoven 1&2
Rotterdam, Zuid-Holland, Netherlands
Source: OpenStreetMap
NorthC Rotterdam Zestienhoven 1&2 is an operating data center in Zuid-Holland, Netherlands, operated by NorthC. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Overview
source: linkNorthC Rotterdam Zestienhoven 1&2 is a mapped data center in Rotterdam, Netherlands, operated by NorthC. Available records identify it as a NorthC data center but disclose no ultimate parent, capacity, or environmental enforcement history.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Een duurzaam datacenter? Jazeker!NorthC Datacenters· Jul 26, 2026
- NorthC Datacenters breidt uit in Zuid-HollandNorthC Datacenters· Jul 26, 2026
- Wat maakt een AI datacenter anders dan een traditioneel datacenter?NorthC Datacenters· Jul 21, 2026
- VOLT lanceert Nederlandse AI Cloud met Dell en NorthCTechzine.nl· Jul 9, 2026
- VOLT sluit samenwerking met Dell Technologies en NorthC Datacenters voor lancering Nederlandse AI CloudEmerce· Jul 9, 2026
- NorthC Datacenters: regionale slagkracht met Europese reikwijdteComputable.nl· Mar 25, 2026