Mapped (unverified)colocation
Cellnex Datacenter Alphen aan den Rijn
Alphen aan den Rijn, Zuid-Holland, Netherlands
Source: Primary source
Cellnex Datacenter Alphen aan den Rijn is a mapped data center in Zuid-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Zuid-Holland
Overview
source: linkCellnex Netherlands B.V. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Hoeveel water slurpen datacenters echt op? De cijfers zetten irritatie over ‘douchebagcampagne’ op scherpAD.nl· Jul 22, 2026
- Datacenter Microsoft gebruikt 1 procent van alle Nederlandse stroom, Google wil geen inzage geven in verbruikNRC - Nieuws, achtergronden en onderzoeksjournalistiek· Jul 13, 2026
- Bewoners maken zich zorgen over komst datacenter: 'Dit kan onze woonomgeving ingrijpend veranderen'nieuwsinalphen.nl· Jul 9, 2026
- Bewoners vrezen komst datacenter dat net zo veel energie verbruikt als helft van de Alphense huishoudensAD.nl· Jul 9, 2026
- Alphense bewoners maken zich zorgen over datacenter aan de Boerhaaveweg in Alphenrodi.nl· Jun 24, 2026
- Forum zet vraagtekens bij mogelijke komst nieuw datacenter MolenweteringAD.nl· Apr 29, 2026
See something wrong or missing on this page? Suggest a correction.