Mapped (unverified)colocation
Cellnex Datacenter Alphen aan den Rijn
Alphen aan den Rijn, Zuid-Holland, Netherlands
Source: Primary source
Cellnex Datacenter Alphen aan den Rijn is a mapped data center in Zuid-Holland, Netherlands. It runs on Netherlands's grid, which was 46% fossil-fuelled at 254 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
254 gCO₂/kWh
Clean electricity
54%
DC power price
15.68¢/kWh
Region
Zuid-Holland
Overview
source: linkCellnex Netherlands B.V. — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
254 gCO₂/kWh
Clean electricity
54%
Fossil electricity
46%
Data-center power price
15.68¢/kWh
A large data center in Netherlands pays 15.68¢/kWh for electricity — a household pays 21.44¢, 27% more than the data center (Eurostat).
Data centres used 4.6% of Netherlands's national electricity in 2024 (CBS (Statistics Netherlands)).
National grid context, not this facility's own metering. Full country picture: Netherlands data centers.
In the news
source: Google News (local + English)- Vergunning voor datacenter rond, maar zorgen over stroomnet blijvenStudio Alphen· Oct 10, 2026
- PRO wil komst datacenters kunnen voorkomenAlphens.nl· Oct 4, 2026
- Eén integrale oplossing met Suite4Sociale RegieCentric B2B· Oct 4, 2026
- PRO wil meer grip op komst datacenters in Alphen aan den Rijnnieuwsinalphen.nl· Sep 30, 2026
- Datacenter vergund terwijl raad nog wacht op debat en omwonenden van niets wetennieuwsinalphen.nl· Sep 25, 2026
- Oldtimers trekken veel bezoekers tijdens 44e Oldtimerdag in Alphen aan den RijnStudio Alphen· Sep 14, 2026
See something wrong or missing on this page? Suggest a correction.