Mapped (unverified)colocation
NorthC Münchenstein (Basel) 2
Münchenstein, Basel-Landschaft, Switzerland
Source: Primary source
NorthC Münchenstein (Basel) 2 is a mapped data center in Basel-Landschaft, Switzerland, operated by NorthC. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
NorthC
Operator
NorthC
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Basel-Landschaft
Overview
source: linkNorthC Schweiz AG — colocation facility (3 networks present). Source: PeeringDB.
Operator chain
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)- Wassergekühlter KI-Superrechner startet den Betrieb in BaselDataCenter-Insider· May 28, 2026
- Wie Rechenzentren laut NorthC vom KI-Boom profitierenIT-Markt· May 27, 2026
- Uptown baut neues KI-Rechenzentrum - Region - Aktuell - wobwochenblatt.ch· Jan 22, 2026
- NorthC errichtet sechstes Rechenzentrum in der SchweizNetzwoche· Jan 13, 2026
- NorthC baut 6-MW-Rechenzentrum in BaselDataCenter-Insider· Sep 18, 2025
- NorthC baut Schweizer Netz an Rechenzentren ausIT-Markt· Sep 12, 2025
See something wrong or missing on this page? Suggest a correction.