Mapped (unverified)colocation
Klixa Muttenz
Muttenz, Basel-Landschaft, Switzerland
Source: Primary source
Klixa Muttenz is a mapped data center in Basel-Landschaft, Switzerland. It runs on Switzerland's grid, which was 2% fossil-fuelled at 39 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
39 gCO₂/kWh
Clean electricity
98%
Region
Basel-Landschaft
Overview
source: linkKlixa Group — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
39 gCO₂/kWh
Clean electricity
98%
Fossil electricity
2%
National grid context, not this facility's own metering. Full country picture: Switzerland data centers.
In the news
source: Google News (local + English)- NorthC plant sechstes Schweizer Rechenzentrum in BaselDataCenter-Insider· Aug 20, 2026
- Neuer AI-Supercomputer braucht so viel Strom, dass Batterien nötig sindBasler Zeitung· Jun 17, 2026
- Arlesheim übergibt IT-Infrastruktur an externes RechenzentrumNau.ch· Aug 27, 2021
- Plötzlich ein «Blackout» im Riesenwürfel: Bei der FHNW ging das Licht ausbz Basel· Aug 14, 2019
See something wrong or missing on this page? Suggest a correction.