nLighten data center, Bourgogne-Franche-Comté, France
Bourgogne-Franche-Comté, France
Source: OpenStreetMap
nLighten data center in Bourgogne-Franche-Comté, France is a mapped facility, operated by nLighten. DataCentersExposed has documented a 18,265 sq ft footprint and 1 environmental-permit record at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linknLighten is a mapped data center in France, run by the operator nLighten. Available records list a footprint of 18,265 square feet. Ownership above nLighten is not disclosed in the facts on hand, and no further operational details have been recorded for the site.
Operator chain
The grid behind this site
source: Ember · EurostatA large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- nLighten étend sa présence avec l’acquisition d’un site à ParisDCmag· Feb 3, 2026
- L’azuréen nLighten s’étend en France avec l’acquisition auprès d’Oxya d’un site à ParisLe Journal des Entreprises· Feb 2, 2026
- nLighten : la nouvelle génération de data centers Edge durablesLe Figaro· Nov 10, 2025
- DCmag vous donne rendez-vous à Strasbourg le 16 octobre pour parler proximité et futur souverainDCmag· Oct 10, 2025
- Grand Est. Un cloud souverain régional en phase d’installationVosges Matin· Aug 7, 2025
- Euclyde Datacenters devient nLighten FranceChannelNews· Nov 26, 2024
Environmental permits
source: Géorisques (ICPE)- SYBERT UIOM0005902597ICPE Autorisation · Besançon 25000 · registered as "SYBERT UIOM" · ~153 m from the mapped location · IED