Mapped (unverified)
Centre de Calcul de l’Université de Bourgogne
Dijon, Bourgogne-Franche-Comté, France
Source: OpenStreetMap
Centre de Calcul de l’Université de Bourgogne is a mapped data center in Bourgogne-Franche-Comté, France. DataCentersExposed has documented a 2,893 sq ft footprint at this site. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Footprint
2,893 sq ft
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Bourgogne-Franche-Comté
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- Le Département, pionnier en matière de souveraineté numérique | Département de la Côte-d’OrDépartement de la Côte-d'Or· Jun 11, 2026
- EDF et Mistral signent un accord de partenariat pour une IA au service du nucléaire et de la souveraineté numériqueInfos Dijon· May 28, 2026
- Une Alpine et un café, soif d'égalité, un data center et un téléphone à touches... Les indiscrétions de la semaineL'Yonne Républicaine· May 10, 2026
- Comment la Silicon Comté veut imposer le Doubs sur la carte numériqueLes Echos· Apr 2, 2026
- NUMÉRIQUE : Le Département muscle sa puissance de calcul avec un PoliCloudInfos Dijon· Feb 10, 2026
- À Noël, 200 salariés de l'entreprise Urgo seront installés au centre Dauphine à Dijonici.fr· Nov 19, 2025
See something wrong or missing on this page? Suggest a correction.