Skip to content
DataCentersExposed
Mapped (unverified)colocation

nLighten Gent BRU1

Merelbeke, Vlaanderen, Belgium

Source: Primary source

nLighten Gent BRU1 is a mapped data center in Vlaanderen, Belgium, operated by nLighten. It runs on Belgium's grid, which was 20% fossil-fuelled at 109 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
nLighten
Operator
nLighten
Grid carbon
109 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Vlaanderen
Attribution & capacity confidence:mediumprimary source

Overview

source: link

nLighten HQ BV — colocation facility (8 networks present). Source: PeeringDB.

Operator chain

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
109 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh

A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Belgium data centers.

No recent coverage found for this facility.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.