Belgacom Netcenter - 02MRI is a mapped data center in Vlaanderen, Belgium. It runs on Belgium's grid, which was 20% fossil-fuelled at 109 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
109 gCO₂/kWh
Clean electricity
80%
DC power price
16.13¢/kWh
Region
Vlaanderen
Overview
source: linkBelgacom — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
109 gCO₂/kWh
Clean electricity
80%
Fossil electricity
20%
Data-center power price
16.13¢/kWh
A large data center in Belgium pays 16.13¢/kWh for electricity — a household pays 33.13¢, 51% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Belgium data centers.
In the news
source: Google News (local + English)- Kantoorgebouw KBC MechelenArchitectura· May 16, 2026
- Bedrijf plaatst kunstwerk op dak gloednieuw datacenter: “Eyecatcher vanop Ring”Nieuwsblad· Mar 30, 2026
- Big tech bouwt datacenters met omvang van kleine stadDe Standaard· Jul 31, 2025
- It-groep NRB opent derde datacenter, eerste in Vlaanderencomputable.be· Jun 25, 2025
- IT-bedrijf NRB opent datacenter in Muizenmade-in.be· Jun 24, 2025
- Stijn De Cock genomineerd voor ‘Voka Prijs Jonge Ondernemer 2025’made-in.be· May 30, 2025
See something wrong or missing on this page? Suggest a correction.