Mapped (unverified)
nLighten Edge Data Centre Liverpool
United Kingdom
Source: OpenStreetMap
nLighten Edge Data Centre Liverpool is a mapped data center in United Kingdom. DataCentersExposed has documented a 174,370 sq ft footprint at this site. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 14, 2026
Real parent
—
Operator
—
Est. capacity
~30-70 MW
Footprint
174,370 sq ft
Grid carbon
217 gCO₂/kWh
Clean electricity
64%
Region
United Kingdom
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkdata center
The grid behind this site
source: Ember · EurostatGrid carbon intensity
217 gCO₂/kWh
Clean electricity
64%
Fossil electricity
36%
National grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Sparking up nLighten’s edge with future-proofed capacitycapacityglobal.com· May 12, 2026
- £10m data centre investment signals Swindon’s digital futureSwindon 24· Jan 30, 2026
- Vacant enterprise data center to be replaced with apartment buildings in Liverpool, UKData Center Dynamics· Nov 5, 2025
- nLighten continues expansion with new data center acquisitionIT Pro· Apr 5, 2024
- I Squared Capital’s nLighten acquires UK Edge firm ProximityData Center Dynamics· Sep 5, 2023
- nLighten expands into UK with Proximity Data Centres acquisitionTelecompaper· Sep 5, 2023