Drax Power Station Data Centre
United Kingdom
Source: Primary source
Drax Power Station Data Centre is a proposed data center in United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Take action
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkProposed transmission demand connection on NESO's Existing Agreements (Gate 2) register: 1200 MW at Trent Valley North Connection Node B 132kV Substation, indicative connection date 2039. A connection agreement is not planning permission — it shows who has reserved grid capacity for a data center.
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- Drax Group Shares Offer Significant Valuation Upside as Data Centre Opportunity Remains Intact, Says Longspur ResearchDirectorsTalk Interviews· Oct 13, 2026
- Drax’s planned data centre could be ‘one of the most polluting’The Planner magazine· Oct 12, 2026
- Why was North Yorkshire’s bid to become an AI growth zone knocked back?Yorkshire Post· Oct 10, 2026
- 1.2 GW UK data centre only “possibility” as Drax halves ambitionMontel News· Oct 9, 2026
- Drax's Planned Data Center Would Burn Nearly 5 Million Metric Tons of Wood a YearNRDC· Oct 9, 2026
- Drax Shares: Longspur Says Missing AI Growth Zone Status is No Setback for Data Centre PlanAskTraders.com· Oct 7, 2026