Digital and Manufacturing Campus Including Data Centres
United Kingdom
Source: Primary source
Digital and Manufacturing Campus Including Data Centres is a proposed data center in United Kingdom. It runs on United Kingdom's grid, which was 36% fossil-fuelled at 217 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Take action
A public decision is in play. This is exactly the moment that changes outcomes — show up and speak.
Your action kit
Sourced arguments and ready-to-send letters — every figure links to a primary record. Edit to add your own story.
Demand a full, public review — not a rubber stamp.
Ask for an independent noise study, a water-and-power impact assessment, enforceable conditions (setbacks, hours, cooling type), and that the record stays open for written comment. Procedural shortcuts have voided approvals elsewhere.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Edit freely before sending — it's a starting point. Add your own story; personal comments carry the most weight.
Join the campaign
Add your name and we'll email you before every hearing, with what to say and where to show up.
Neighbors taking a stand
Overview
source: linkProposed transmission demand connection on NESO's Existing Agreements (Gate 2) register: 500 MW at Easterhouse GSP, indicative connection date 2037. A connection agreement is not planning permission — it shows who has reserved grid capacity for a data center.
The grid behind this site
source: Ember · EurostatNational grid context, not this facility's own metering. Full country picture: United Kingdom data centers.
In the news
source: Google News (local + English)- This Week's Top Five Stories in the Data Centre IndustryData Centre Magazine· Jun 13, 2026
- How Ark Data Centres is building the future of sustainable AI infrastructureManufacturing Today· Jun 2, 2026
- Data centres: planning policy, sustainability, and resilienceThe House of Commons Library· May 27, 2026
- Plans in for phase one of Sembcorp’s 1m sq ft Teesside data centrePlace North East· May 19, 2026
- Sembcorp, Digital Reef announce phase 1 of 280 MW UK data centreThe Business Times· May 19, 2026
- Powered land and zombie projects: Real estate in the age of AIReuters· Apr 25, 2026