Mapped (unverified)colocation
MERLIN Edged MAD01 - Madrid-Getafe
Getafe, Comunidad de Madrid, Spain
Source: Primary source
MERLIN Edged MAD01 - Madrid-Getafe is a mapped data center in Comunidad de Madrid, Spain. It runs on Spain's grid, which was 25% fossil-fuelled at 154 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
154 gCO₂/kWh
Clean electricity
75%
DC power price
13.74¢/kWh
Region
Comunidad de Madrid
Overview
source: linkMERLIN Edged — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
154 gCO₂/kWh
Clean electricity
75%
Fossil electricity
25%
Data-center power price
13.74¢/kWh
A large data center in Spain pays 13.74¢/kWh for electricity — a household pays 24.08¢, 43% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Spain data centers.
In the news
source: Google News (local + English)- El Atleti golea a un equipo de LaLiga para empezar la pretemporadaFlashscore.com.ar· Jul 29, 2026
- Nebius aterriza en España con 18 MW para IA en el campus de Merlin-Edged de GetafeData Center Dynamics· Jul 6, 2026
- Nebius, el gigante de los centros de datos para IA apoyado por Nvidia y Meta, entra en España de la mano de MerlinEl Mundo· Jul 3, 2026
- Merlin Properties prevé poner en marcha su centro de datos de Navalmoral de la Mata en unos dos años y medioLa Portada de Extremadura· Jun 22, 2026
- Merlin se monta en la ola de los centros de datos y apunta a una revalorización sustancialFinanzas.com· May 17, 2026
- El Rayo se queda con la permanencia ante un Geta con la cara partidaResultados de fútbol en vivo· May 3, 2026
See something wrong or missing on this page? Suggest a correction.