Mapped (unverified)
Leibniz Universität IT Services
Niedersachsen, Germany
Source: Wikidata
Leibniz Universität IT Services is a mapped data center in Niedersachsen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 12, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Niedersachsen
Status · click to filter
Most sites are mapped — located but awaiting a second source. How we verify
Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.
Overview
source: linkNo description yet.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Nachruf: Herr Professor Dr.-Ing. Helmut PralleLeibniz Universität Hannover· Oct 21, 2024
- Deutschlands erster hybrider Quantencomputer steht im Leibniz-RechenzentrumDataCenter-Insider· Jun 18, 2024
- Grüne IT im WindradUniversität Paderborn· Sep 2, 2022
- Das LRZ übernimmt für die Münchner Universitäten den VerwaltungsnetzbetriebDataCenter-Insider· Nov 4, 2020
- InfoCenter an neuem StandortPresseportal· Mar 27, 2019
- Leibniz-Rechenzentrum der Bayerischen Akademie der Wissenschaften: Bode, Arndt | BR.deBR· Apr 1, 2015