Skip to content
DataCentersExposed
Mapped (unverified)

Gauß-IT-Zentrum

Niedersachsen, Germany

Source: OpenStreetMap

Gauß-IT-Zentrum is a mapped data center in Niedersachsen, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).

Reporting by · Updated Jun 12, 2026

Real parent
Operator
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Niedersachsen
Attribution & capacity confidence:mediumprimary source
Status · click to filter

Most sites are mapped — located but awaiting a second source. How we verify

Dot size = disclosed capacity (MW). Smallest = undisclosed, not small.

Overview

source: link

Rechenzentrum der TU Braunschweig, zentraler Dienstleister für IT-Dienste

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh

A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).

National grid context, not this facility's own metering. Full country picture: Germany data centers.

No recent coverage found for this facility.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.