Karis Critical Data Center
Dekalb, DeKalb County, IL
Source: Primary source
Karis Critical Data Center is a proposed data center in DeKalb County, IL. DataCentersExposed has documented a 1,750,000 sq ft footprint at this site.
Reporting by Eric Keller · Updated Jun 18, 2026
Overview
source: link20-acre substation possibly being constructed on site Imported from the FracTracker Alliance U.S. Data Centers Tracker after review. Details to be corroborated from primary sources.
Grid & water — why here
source: HIFLD · EPAThe closest existing grid infrastructure and the municipal water system this location sits in — the same constraints the buildout model screens on (it won't site a campus more than ~2 km from a substation or ~5 km from municipal water). Distances are straight-line to public HIFLD/EPA features, not a metered connection.
In the news
source: Google News- DeKalb resident calls data center plan 'environmental racism' in heated zoning clashThe Cool Down· Jun 13, 2026
- DeKalb extends moratorium as data center backlash grows across GeorgiaSaportaReport· Jun 10, 2026
- Data center moratorium: DeKalb County blocks new tech hubs in 5-2 voteAOL.com· Jun 10, 2026
- DeKalb County extends data center moratorium through SeptemberCBS News· Jun 10, 2026
- DeKalb County extends data center moratoriumYahoo· Jun 10, 2026
- DeKalb County Commission extends data center moratoriumWABE· Jun 10, 2026
Data-center discussions in DeKalb County
source: LocalView (CC0)Local-government meetings in this county that discussed data centers, each cued to the moment. From the public LocalView corpus of government meetings on YouTube — a county-level signal, not necessarily about this specific site.
Tax breaks & subsidies
source: Good Jobs First / GASB 77No per-deal tax break is linked to this site yet. No state discloses the recipient of a data-center abatement at the facility level, so per-site deals are rare in the public record. If you have a development agreement or board resolution for this site, send it to us.
Illinois reported $983.2M in Data Center Investment Program — state & local sales/use tax exemption (20 ILCS 605/605-1025; administered by DCEO) (2019-2024 (27 certified data centers; cumulative estimated exemption value)) (Illinois Department of Commerce and Economic Opportunity (DCEO)). Program-wide, not attributable to this site.
Water use
No public record of this facility's water use. We check state withdrawal reporting for self-supplied sites; municipally supplied sites only become visible through a public-records request to the local water utility — a per-facility request tool is coming. If you have a utility document for this site, send it to us.
EPA permits & violations
source: EPA ECHONo reported violations as of last sync.
Nearest school
source: HIFLD / NCESThe nearest public school, Dekalb Early Lrng And Dev Ctr in Dekalb, is 2.1 mi from this site (231 students).
Schools are sensitive receptors for the noise, backup-generator exhaust, and traffic a large data center brings. Straight-line distance to the nearest public school (HIFLD/NCES, US public schools only).
Hearings timeline
No public-hearing records linked to this site yet. We surface planning-commission and board-of-supervisors dates when a record names a facility. If you know of a hearing on this site, tell us.