Mapped (unverified)colocation
IzarHost
Bidart, Nouvelle-Aquitaine, France
Source: Primary source
IzarHost is a mapped data center in Nouvelle-Aquitaine, France. It runs on France's grid, which was 5% fossil-fuelled at 41 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
41 gCO₂/kWh
Clean electricity
95%
DC power price
12.24¢/kWh
Region
Nouvelle-Aquitaine
Overview
source: linkIZARLINK SAS — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
41 gCO₂/kWh
Clean electricity
95%
Fossil electricity
5%
Data-center power price
12.24¢/kWh
A large data center in France pays 12.24¢/kWh for electricity — a household pays 29.26¢, 58% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: France data centers.
In the news
source: Google News (local + English)- « La grosse erreur est de croire qu’un data center sur le sol français garantit la sécurité des données »Placéco· Jun 10, 2026
- Méga data center : qui est l’Américain Vantage, derrière le projet au nord-Gironde ?Placéco· Jun 9, 2026
- Une matinée d’échanges sur l’intégration de l’IA en entreprise à BidartPlacéco· Jun 8, 2026
- Prix Science Ouverte 2025 : le CDSP récompensé pour le projet Panel de CaenSciences Po· Dec 3, 2025
- Souveraineté numérique - Nicolas Leroy-Fleuriot : « Ne pas livrer nos secrets aux puissances étrangères »Placéco· Oct 31, 2025
- ICI ON PRODUIT LA VIE - L’IzarFamily invente une dimension humaine pour les télécoms et le numériquePresseLib· Sep 16, 2025
See something wrong or missing on this page? Suggest a correction.