Mapped (unverified)colocation
ITENOS Stuttgart (STR3)
Stuttgart, Baden-Württemberg, Germany
Source: Primary source
ITENOS Stuttgart (STR3) is a mapped data center in Baden-Württemberg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Overview
source: linkITENOS GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Stuttgart setzt mit „The Gate“ auf digitale Kultur und KI-Debattennadr.de· May 18, 2026
- Frühere Daimler-Zentrale: Neues Datencenter – So kämpft Stuttgart um Strom, Kühlung und Datenhoheitstuttgarter-nachrichten.de· May 15, 2026
- Nexspace setzt auf regionale ExpansionDataCenter-Insider· Apr 23, 2026
- Euwax Trends: Microsoft nimmt neues KI-Rechenzentrum in Betrieb – Ethereum-ETFs mit neuntem Zufluss-Tag in Folgeaktiencheck.de· Apr 22, 2026
- Wo stehen Deutschlands erste KI-Fabriken?FAZ· Mar 18, 2026
- Nlighten speist Abwärme in Wärmenetz im Synergiepark einDataCenter-Insider· Mar 10, 2026
See something wrong or missing on this page? Suggest a correction.