Mapped (unverified)colocation
ITENOS Stuttgart (STR2)
Böblingen, Baden-Württemberg, Germany
Source: Primary source
ITENOS Stuttgart (STR2) is a mapped data center in Baden-Württemberg, Germany. It runs on Germany's grid, which was 41% fossil-fuelled at 330 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
330 gCO₂/kWh
Clean electricity
59%
DC power price
21.56¢/kWh
Region
Baden-Württemberg
Overview
source: linkITENOS GmbH — colocation facility (1 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
330 gCO₂/kWh
Clean electricity
59%
Fossil electricity
41%
Data-center power price
21.56¢/kWh
A large data center in Germany pays 21.56¢/kWh for electricity — a household pays 39.43¢, 45% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Germany data centers.
In the news
source: Google News (local + English)- Converge schluckt Schul-IT-Dienstleister Rednetconnect-professional· Sep 3, 2025
- Unternehmen & Projekte / Rechenzentrum in Böblinger Gewerbegebiet Hulb-West eröffnetimmofokus.at· Jul 28, 2025
- Atlas Edge nimmt „STR001“ bei Stuttgart in BetriebDataCenter-Insider· Jul 22, 2025
- Neues 20-MW-Rechenzentrum in Stuttgartconnect-professional· Jul 22, 2025
- Atlas Edge baut carrier-neutrales Datacenter in StuttgartDataCenter-Insider· Apr 29, 2025
- IBM eröffnet im Kreis Böblingen erstes Quantenrechenzentrum in EuropaSWR· Oct 1, 2024
See something wrong or missing on this page? Suggest a correction.