Mapped (unverified)colocation
iTech Towers 2
New Territories, Hong Kong
Source: Primary source
iTech Towers 2 is a mapped data center in Hong Kong. It runs on Hong Kong's grid, which was 99% fossil-fuelled at 676 gCO₂e/kWh in 2024 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
676 gCO₂/kWh
Clean electricity
1%
Region
Hong Kong
Overview
source: linkGrand Ming Group Holdings Limited — colocation facility (26 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
676 gCO₂/kWh
Clean electricity
1%
Fossil electricity
99%
National grid context, not this facility's own metering. Full country picture: Hong Kong data centers.
In the news
source: Google News (local + English)- National cabinet showdown looms over green data centre rulesAFR· Aug 5, 2026
- Indigenous IT firm eyes data center campus in Canada’s Northwest TerritoriesData Center Dynamics· Aug 3, 2026
- Hong Kong data centre loan sale shows banks limiting sector exposureThe Business Times· Jul 29, 2026
- Big Tech Is Now Targeting Native American Land for Massive Data CentersThe New York Times· Jul 27, 2026
- Why are the world's biggest AI firms so attracted to the NT?ABC News & Headlines – Australian Broadcasting Corporation· Jul 12, 2026
- Oregon hikes data center electric rates 29% in PGE territoryCentral Oregon Daily· Jul 7, 2026
See something wrong or missing on this page? Suggest a correction.