Skip to content
DataCentersExposed
Mapped (unverified)colocation

Cuhk

Hong Kong, Hong Kong

Source: Primary source

Cuhk is a mapped data center in Hong Kong. It runs on Hong Kong's grid, which was 99% fossil-fuelled at 675 gCO₂e/kWh in 2024 (Ember).

Reporting by · Updated Jun 17, 2026

Real parent
Operator
Grid carbon
675 gCO₂/kWh
Clean electricity
1%
Region
Hong Kong
Attribution & capacity confidence:mediumprimary source

Overview

source: link

Chinese University of Hong Kong — colocation facility (9 networks present). Source: PeeringDB.

The grid behind this site

source: Ember · Eurostat
Grid carbon intensity
675 gCO₂/kWh
Clean electricity
1%
Fossil electricity
99%

National grid context, not this facility's own metering. Full country picture: Hong Kong data centers.

No recent coverage found for this facility.

See something wrong or missing on this page? Suggest a correction.

Methodology & sources

Every row carries a confidence level (high / medium / low) and a source URL. Spot an error? Tell us.