Mapped (unverified)colocation
ITandTEL Wels
Wels, Oberösterreich, Austria
Source: Primary source
ITandTEL Wels is a mapped data center in Oberösterreich, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Oberösterreich
Overview
source: linkeww ag — colocation facility (3 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Von Ostermiething bis Perg: Wo Rechenzentren in Oberösterreich stehenOberösterreichische Nachrichten· Jul 21, 2026
- Google-Rechenzentrum: Kritik hält vor Demonstration anTips.at· Jul 17, 2026
- Damit es in Oberösterreich genehmigt wird: Windrad bekommt RechenzentrumDie Tagespresse· Jul 14, 2026
- Schock im Freibad: Turmspringer trifft beim Sprung auf ungebetenen GastT-Online· Jun 6, 2026
- Wels: "Stadt der Gärten" wird sichtbarTV1 - Oberösterreich· Apr 20, 2026
- Finanzpolizei: Verstöße bei Google-Bauprojektooe.ORF.at· Mar 3, 2026
See something wrong or missing on this page? Suggest a correction.