Mapped (unverified)colocation
ITandTEL Perg
Perg, Oberösterreich, Austria
Source: Primary source
ITandTEL Perg is a mapped data center in Oberösterreich, Austria. It runs on Austria's grid, which was 17% fossil-fuelled at 117 gCO₂e/kWh in 2025 (Ember).
Reporting by Eric Keller · Updated Jun 17, 2026
Real parent
—
Operator
—
Grid carbon
117 gCO₂/kWh
Clean electricity
84%
DC power price
19.02¢/kWh
Region
Oberösterreich
Overview
source: linkeww ag — colocation facility (2 networks present). Source: PeeringDB.
The grid behind this site
source: Ember · EurostatGrid carbon intensity
117 gCO₂/kWh
Clean electricity
84%
Fossil electricity
17%
Data-center power price
19.02¢/kWh
A large data center in Austria pays 19.02¢/kWh for electricity — a household pays 24.37¢, 22% more than the data center (Eurostat).
National grid context, not this facility's own metering. Full country picture: Austria data centers.
In the news
source: Google News (local + English)- Gegner warnen: Mit KI-Rechenzentrum wird Kronstorf zum Versuchslabore-steyr.com· Jul 15, 2026
- Protest beim Google-Rechenzentrum: Initiativen werfen u.a. Fragen zum Grundwasser aufe-steyr.com· Jun 15, 2026
- "Googlehupf": Spatenstich für Google-Rechenzentrum in Kronstorfe-steyr.com· Apr 25, 2026
- Nach Bauverhandlung: Baubescheid für Google-Rechenzentrum könnte noch 2025 erfolgene-steyr.com· Nov 13, 2025
- Baubescheid für Google in Kronstorf könnte noch heuer erfolgene-steyr.com· Aug 2, 2025
- Technologiezentrum Perg: Heimat der InnovationMeinBezirk.at· Apr 18, 2019
See something wrong or missing on this page? Suggest a correction.